The Gezhouba Dam or Gezhouba Water Control Project on the Yangtze River is located in the western suburbs of Yichang City in central China's Hubei province.

Gezhouba Dam
Gezhouba Dam

Construction started on December 30, 1970 and ended on December 10, 1988. The dam has a total installed electrical capacity of 2,715 MW.

Gezhouba Dam
Gezhouba Dam

After rushing out of Nanjin Pass ("South Ford Pass"), the Yangtze River slows down and widens from 300 metres (980 ft) to about 2,200 metres (7,200 ft) at the dam site. Two small islands, Gezhouba and Xiba, divided the river into three channels. There the Gezhouba Project was built.

Gezhouba Dam
Gezhouba Dam

The navigation lock No.2 on the third channel was, when built, among the 100 largest in the world. The lock chamber is 280 metres (920 ft) long and 34 metres (112 ft) wide, with a minimum draft of 5 metres (16 ft) at the sill. It provides passage for 10,000 ton ships.

Gezhouba Dam
Gezhouba Dam

Features of the Gezhouba Project

The experimental dam of the Three Gorges Project, Gezhouba Project is located at the lower end of the Three Gorges in the suburb of Yichang City, 38 km downstream of the TGP.

Gezhouba Dam
Gezhouba Dam

Gezhouba Project is a cascade which regulates the tail water flow from the TGP and improves the navigation conditions between the two dams. After completion of the TGP, the annual guaranteed output of electricity from Gezhouba Hydro-power Plant will increase by about 430,000 kw.